A newly built industrial unit in Mijas (Malaga), with over 400 m² of offices, showroom and air conditioning, plus a fleet of electric forklifts and pallet trucks. The large roof area available was ideal for a 61 kWp solar installation.
The installation includes 100 AIKO 610 W panels with a 50 kW central Huawei inverter, a Toscano protection panel and Rejiband cable protection tray.
The client was moving from another unit and decided to switch their entire fleet of forklifts and pallet trucks to electric, on top of having over 400 m² of offices, showroom and other air-conditioned spaces. The roof, with plenty of available area, was ideal for a solar installation.






Environmental commitment — learn more